Choose who buys the fabric and develops the clothes
Use the state of your first design to choose the work you need, then assign each material and approval.
Market-specific guidance. Sources and review information are included below.
Quick answers from this guide
When should I supply the fabric?
Consider supplying fabric when the exact material is approved, its purchase and delivery can be managed, and the making instructions are ready. Confirm the maker can work with it and agree who handles shortages, testing and supporting materials.
What if I have an idea but no patterns or approved fabric?
Ask for development as a named part of the scope: material options, patterns, samples and revisions. Buying materials and making finished clothes does not automatically include resolving the design.
How do I compare the two routes?
Compare the same finished garment and include the tasks left with the brand. List purchasing, delivery into production, development, testing and change handling. Keep the delivery term separate from the manufacturing scope.
On this page 5 sections
Choose the manufacturing arrangement by listing what is ready and what somebody still needs to do. Supplying fabric can work for a fully developed style. An early idea needs development as well as material purchasing and production. Three ways to buy manufacturing explains the arrangements; the examples here help turn that choice into an enquiry.
01Start with the design's actual state
Put the available items together: drawings, measurements, patterns, fabric reference and any approved sample. Mark each as approved, provisional or missing. A finished-looking sketch does not establish that the fit or fabric is ready for production.
CMT means cut, make and trim. In this arrangement, the brand typically supplies the main materials and pays for making, with the precise boundary agreed in the quote. Full-package is used for a wider supply arrangement, but its name alone does not confirm that original design development is included.
02Example: a developed shirt with a settled fabric source
Suppose the shirt has an approved fit, production patterns and a fabric the brand already purchases. A making-only arrangement may fit if the brand can deliver usable fabric in the required quantity and the maker accepts the specification.
The remaining questions are concrete. Who checks the cloth on arrival? Who buys the buttons, thread and labels? Who pays for replacement cloth if the supplied quantity is insufficient? What happens to the cutting date if delivery is late?
Write those answers alongside the making quote. The arrangement is only workable if someone has time and authority to manage the material purchase and resolve problems.
03Example: an overshirt that exists as references and sketches
Suppose the intended shape is clear but the fabric, measurements and pattern are still undecided. A production quote based on an assumed fabric can help explore cost, but it is not approval of the clothes.
Ask for a development scope covering material options, the pattern, a first sample and the review process. Identify who gives fit comments and how an approved sample becomes the final making instructions. Request separate visibility of development work and production assumptions.
A full-package quote that starts from a finished technical file may leave all of this work with the brand. Check the starting requirements before accepting it.
04Assign each material and decision
For the main fabric, fastenings, labels and packaging, name who selects, purchases, approves and delivers each part. One party can select an exact material while another purchases it. This mixed arrangement needs the same clear responsibilities.
Then identify who may approve a substitution and who communicates its effect on cost and timing. Material purchasing by the maker does not remove the brand's approval of a changed colour, feel or finish.
Keep the shipping arrangement in its own part of the agreement. A manufacturing service name does not say where transport costs or risk transfer. The ICC describes Incoterms rules as rules allocating tasks, costs and risks in delivery; they do not replace the agreed development scope.
05Send an enquiry that describes the work needed
For the developed shirt, the enquiry might say: “We have approved fabric, patterns and a fit sample. Please quote for making, list the supporting materials you include, and confirm your fabric-receiving requirements.”
For the overshirt, it might say: “We have the design references and proposed quantities. We need fabric selection, pattern development and samples before production. Please describe the approval stages and the assumptions behind your estimate.”
These are illustrative enquiry texts. Add the actual quantity, material details and requested delivery window before sending them. The useful response explains what the maker will do, what the brand must provide and the next decision needed to proceed.
Sources
Official sources and further reading are linked below. Regulations change; confirm current requirements for your product and market.
Incoterms rules, International Chamber of Commerce →